Sign up
Menu

ENGINEERING PRACTICES, BUILT INTO THE WORKFLOW

A clear process.
Evidence at every step.

Our AI hardware engineer works with project instructions informed by published engineering best practices. Every project receives a development process, discipline guides and a consistent file structure. Foxy is instructed to connect requirements to checks, record design decisions and keep unresolved issues visible.

  1. Define requirements
  2. Design & review
  3. Prepare a prototype
  4. Measure & improve

01 / SYSTEMS

Start with measurable requirements.

NASA’s Systems Engineering Handbook informs requirements, interfaces, verification planning and review gates. Foxy’s guides adapt these practices to the scope of your project.

02 / DESIGN REVIEW

Review the details that matter.

Altium and Andrew Zonenberg’s PCB checklists inform schematic and layout review: pinouts, supply margins, return paths, mechanical clearances and manufacturing data.

03 / COMPONENTS

Use the actual device documentation.

TI design guides and KiCad library conventions inform component and footprint review. Rules must match the selected part, package and manufacturer documentation.

04 / CIRCUIT BEHAVIOR

Check the reasoning behind the circuit.

Analog Devices’ grounding and decoupling tutorials inform mixed-signal and power design. Calculations and layout reviews must state their assumptions and limits.

05 / REPRODUCIBILITY

Keep a build someone can follow.

OSHWA practices inform editable sources, BOMs, assembly instructions and design rationale. KiBot is a reference for repeatable KiCad checks and exports; available tools vary by environment.

06 / PRODUCTION

Separate prototypes from production.

Instrumental’s EVT/DVT/PVT guide informs build stages and exit criteria. Physical testing, qualification and production yield need actual results from your hardware and process.

These sources inform Foxy’s workflow; their authors do not endorse or certify FoxyCAD. Installed instructions do not prove a check was performed. Foxy’s file and report consistency checks are separate from independent engineering review, physical testing and product certification.

Have an idea to build?

Enter Your Workshop